top of page
Chu-iil Belt
Map 3.jpg

Chu-Ili Belt

Central Asian orogenic belt

 

East Star Resources has 364.3 km² of acreage across two licences in the Chu-Ili Belt – a Central Asian orogenic gold belt with gold-bearing vein and stockwork zones, and IRGS and shale deposits. The belt is significantly larger in scale to the Kalgoorlie gold district in Western Australia but has had very little regional or local geophysics applied to date, presenting a significant opportunity to apply modern exploration technology.

Apmintas Licence_May 2022_edited.jpg
Apmintas

Apmintas Licence

Very high-grade gold along strike from very high-grade mines

 

Highlights

  • First movers – only made available in June 2020

  • Multiple outcropping gold targets including 6 gold occurrences and 7 mineralisation points

  • Historical data shows P1-P2* resources (GKZ) of ~910 koz in just one target and peak grab samples of 1,214 and 4,484 g/t Au

  • Artisanals mining gold at surface

 

Ownership (Joint Venture): East Star 80% / State Mining Co 20%        

​Size: 259 km²

 

Work to date

  • Initial target zones recorded high grade gold occurrences

  • Our structural interpretation introduces new concepts including IRGS

  • Historic trenching, rock chip and soil sampling and some drilling confirms walk up drill targets with still >60% of licence under cover, ready for exploration using modern techniques

  • 3,127m of RC drilling (2021) resulting in 63m @ 4.51 g/t gold at Novoe target and 14m @ 2.54 g/t Au at Eshkilitau II target

  • 4,567-line km of drone magnetics (2021) – 22 targets identified, 9 with historical gold occurrences and 9 with geochemical anomalies of gold pathfinders

 

Next steps

  • Modelling and assessment of results

  • Prioritise areas for 2023 exploration programme

Dalny
Dalny Licence_May 2022.jpg

Dalny Licence

Geophysical and geochemical gold targets; high grade copper potential

 

Highlights

  • Two groups of gold occurrences and six individual occurrences

  • Historical geophysical and geochemical anomalies never drilled

  • Current and past operating mines on both sides of licence along strike

 

Ownership (Joint Venture): East Star 80% / State Mining Co 20%      

 

Size: 105.3 km²

 

Work to date

  • Geochemical and geophysical targets identified

  • Decades of historical data

  • Drone magnetics (2021) - 11 targets identified prospective for orogenic gold

  • Field mapping and sampling in April 2022 – high grade assay results from rock chip samples

  • 19 drill holes totalling 1,860m drilled on the Alatagyl target in 2022

 

Next steps

  • Further analysis is underway to determine next steps to progress exploration

bottom of page